LNF: CONVEGNO NAZIONALE SULLA FISICA DI ALICE
LABORATORI NAZIONALI DI FRASCATI
Agenda ALICE EMCal Production Kick-off Meeting 16-18 January 2008 16 January: (h 9-18 Auletta Leale, Nuclear Physics Bldg 22, first floor) Module design: Review design of all parts in the assembly: Start with the assembly CAD model Part List: lead absorber, scintillator tile, bond paper, backplate, compressionplate, belleville washers, belleville washers plunger, dowel pin, bushing, stud, frontplate, straps, strapflange, strapfoil, black sticker, frontplate, fiber bundle terminator, strongback, LED ferrule, preampl fiber manifold, APD mount, light guide, T-Card, T-Card fixation, coverplate, Review engineering analysis: Compression load Number of Bellville washer Friction coefficient Torque and stress in all fasteners Deflection/delamination results 17 January: (h 9-18 Aula Direzione, Administration Building 1, first floor) Finish items left from first day Strip module design: Integration of modules with the strong back: Tolerance and clearance analysis Review all interfaces. Finalize and approve all fabrication drawings. Strip module handling tooling Discuss procurement plan of module components: Complete Procurement spreadsheet list of parts (A) + miscellaneous (screws, washers, nuts, etc...) Subcontractors and lead institutions Placing bids, first delivery, rate of production Module Assembly Tooling and Assembly procedures: Review assembly tooling design Review assembly procedures, operator's manual, assembly time Discuss inspection and QC plane 18 January: (h 9-18 Aula Direzione, Administration Building 1, first floor) Finish items left from second day SM module Integration SM Crate Final Design: Electronic crate: Status of conceptual design, envelop, interfaces Crates Production and Shipping Plan Review Production drawings Crate production and assembly at B3 in 2008 Crate shipping to CERN, then to Grenoble and Yale SM Assembly Procedures SM assembly tooling SM calibration: + stripmodules calibration ? modules calibration ? SM shipping Shipping frame design Shipping plan (subcontract design and fabrication of frame?) Shipping cost? Integration with Alice: SM acceptance test at Alice before installation SM installation plan and resources

DATA: 16-01-2008

Sito Collegato : http://www.lnf.infn.it/conference/alice2008/

Istituto Nazionale di Fisica Nucleare - Piazza dei Caprettari, 70 - 00186 Roma
tel. +39 066840031 - fax +39 0668307924 - email: presidenza@presid.infn.it